Send one package: a one-page deal summary, entity documents, the signed contract, a line-item scope of work, comparable sales, your exit plan, insurance and title contacts. A complete file is what lets a loan close in 7-10 business days on complete files, counted after borrower conditions are met. The checklist below lists every item in the order an underwriter reads it.
Chicago Flip Deal Submission Checklist
Everything a lender needs to price and close a Chicago fix and flip loan, in the order an underwriter reads it.
On this page
- Who should use this checklist?
- What goes in the deal summary block first?
- Which entity documents does an underwriter ask for?
- How do you document the property, the work and the value?
- What is in the deal submission checklist?
- Which gaps stall a Chicago file most often?
- What does the lender do with the package?
- What should you send today?
Most slow flip loans are slow for the same reason: the lender asked for something on Tuesday that could have been in the first email. This checklist is the list an underwriter works from, turned around so you can fill it before anyone asks. It is written for a non-owner-occupied purchase and rehab in Chicago or Cook County, borrowed in an LLC or corporation.
Who should use this checklist?
Use it if you are a flipper or BRRRR investor sending a deal to a private lender, a wholesaler packaging a deal for your buyer, or an agent whose investor client needs financing during attorney review. It is the working list behind the loan requirements page.
It is published by a lender, Jaken Finance Group, whose flip loan requirements guide covers the underwriting side. Other lenders will add or drop items.
What goes in the deal summary block first?
The summary block is thirteen lines: address, PIN, property type and legal unit count, price, closing date, rehab budget, your value estimate with comps, loan requested, exit, entity, guarantors, recent flips and cash on hand. A lender can size and price a loan from those lines. Everything else in the package is evidence for one of them.
Fill it in with numbers you can support. If your rehab figure is a guess, the rehab holdback will be sized from a guess, and you fund the difference later.
Which entity documents does an underwriter ask for?
An underwriter asks for proof that the borrower exists, who owns it and who can sign: articles, operating agreement, EIN letter, good standing, IDs and a credit authorization for each guarantor. Each owner who signs a personal guarantee is reviewed. On credit, the published position is: no minimum FICO on select programs; credit is reviewed, never waived.
Two details save time. Order the Certificate of Good Standing after you are under contract so it is still current at closing. If the LLC has more than one member, add a signed resolution naming the signer. The guide to entity documents at closing covers the rest.
How do you document the property, the work and the value?
Send the full contract with every rider, dated photos of every room and elevation, a line-item scope of work, and closed comparable sales. The lender is answering three questions: what are you buying, what will you do to it, and what will it be worth.
For the work, name your contractor and give the license number. The Department of Buildings says a general contractor license is needed for most construction, alteration and repair work done for compensation, as an investment or with intent to sell. Say which permit process the job falls under. The scope and budget template produces the line items in the format lenders read.
For value, supported by comparable sales; a third-party valuation may be required. Use the comp packet template and keep any value figure out of what goes to an appraiser.
What is in the deal submission checklist?
The full document is below, and the PDF is the same content laid out for print.
1. Deal summary
Fill this in first. A lender can quote from this block alone; every document below proves one of these lines.
2. Borrower and entity documents
Flip loans are made to a business entity, and its owners sign personal guarantees. The lender has to confirm the entity exists, who owns it and who can sign.
- Articles of organization or incorporation
File-stamped copy from the Illinois Secretary of State, or from the home state for an out-of-state entity. - Signed operating agreement or bylaws
Must show every member, ownership percentages and who has authority to borrow and sign. - IRS EIN confirmation letter
Form CP 575 or a 147C verification letter. - Certificate of Good Standing
Issued by the Illinois Secretary of State. Lenders usually want a recent one, so order it after you are under contract. - Government photo ID for each guarantor
- Signed credit and background authorization for each guarantor
Credit is reviewed on every file. Explain any late payments, judgments or foreclosures in a short letter before the lender finds them. - Schedule of real estate owned
Address, ownership share, value, loan balance and payment for each property. - Two most recent monthly statements for each account holding closing funds and reserves
All pages. Large recent deposits need a paper trail. - Entity resolution or consent naming the signer
Needed when the entity has more than one member or manager.
3. Property and contract
- Fully executed purchase contract with every rider and amendment
Include attorney-review modification letters and any extension of the closing date. - Assignment agreement and the underlying contract, if you are buying an assigned contract
- Proof the earnest money was deposited
- Listing sheet or the seller marketing package, if there was one
- Dated interior and exterior photos of every room, the basement, mechanicals, roof, porches and all four elevations
- Occupancy status
Vacant, owner in possession or tenants. Attach leases and a rent roll if anyone will be living there at closing. - Access contact and lockbox details for the valuation visit
- Legal unit count and where you confirmed it
For residential buildings of five or fewer units in Chicago, the Certificate of Zoning Compliance states the legal count. - Known building violations, court cases or vacant building registration, with a plan and a budget line for each
- Condominium units: association contact and the resale disclosure packet under Section 22.1 of the Illinois Condominium Property Act
4. Scope of work and budget
The rehab holdback is sized from this package. A lump-sum number with no lines slows every file.
- Line-item scope of work by trade, with labor and material for each line
- Contractor bid or signed contract matching the scope total
- General contractor name, City of Chicago license number and certificate of insurance
The Department of Buildings licenses general contractors and separately licenses electrical, plumbing and mason contractors. - Permit plan
Which Department of Buildings process the work needs (Express Permit Program, Standard Plan Review or Self-Certification), who is filing and when. - Architect or expediter engagement, if drawings are required
- Draw schedule: which scope lines finish in each phase
- Contingency line, shown separately from the trade lines
- Project timeline from closing to listing or refinance
5. Value support
You supply facts about the finished property and recent sales. The lender or appraiser reaches the value.
- Comp packet: three to six closed sales with address, sale date, price, beds, baths, square feet, condition and source
- Subject facts before and after: beds, baths, finished square feet, units, parking
- Planned finish level, with product selections or photos of your last completed project
- Any work that changes the unit count, the bedroom count or the finished area, with the permit path for it
- Nothing in the packet sent to an appraiser states or requests a value
6. Exit plan
- Sale exit: listing agent, pricing approach, expected days on market and the closing timeline for a financed buyer
- Refinance exit: expected rents by unit, lease status and the long-term loan you plan to apply for
- Backup exit if the first one stalls
For example: rent and refinance if the sale market slows, or price reductions on a schedule. - Total months from closing to payoff, compared with the loan maturity date
7. Experience
List only what you can document. First-time flippers are reviewed; a strong contractor and cash reserves carry more weight on a first file.
| Property address | Bought (date, price) | Rehab cost | Sold or refinanced (date, price) | Proof attached |
|---|---|---|---|---|
8. Insurance
- Builder's risk or vacant-dwelling renovation policy: quote before underwriting, binder before closing
A standard landlord or homeowner policy usually excludes a vacant building under construction. - General liability coverage for the borrowing entity
- Lender named as mortgagee and loss payee, using the exact clause the lender provides
- Coverage amount at least equal to the loan or the replacement cost, as the lender requires
- Flood zone determination, and flood coverage if the property is in a special flood hazard area
- General contractor's certificate of insurance showing general liability and workers' compensation
9. Title, closing and contacts
One wrong email address can cost a week. Confirm wire instructions by phone, using a number you already trust.
Which gaps stall a Chicago file most often?
Five gaps cause most of the delay:
- Unit count stated from the listing. For residential buildings of five or fewer units, the City's Certificate of Zoning Compliance certifies the legal number of dwelling units. A three-flat with two legal units is a two-flat to an appraiser.
- Insurance left for closing week. A vacant masonry building under renovation needs a builder's risk or vacant-dwelling policy, and not every carrier writes one.
- A contract without its amendments. Attorney-review letters change price, credits and dates. The lender needs the contract as it stands today.
- Condo files without the association packet. The seller obtains the resale disclosures listed in Section 22.1 of the Condominium Property Act from the board; ask for them on day one.
- No answer on the water certificate. The City will not issue transfer stamps without a Full Payment Certificate, so a missing one stops the deed from recording.
What does the lender do with the package?
The lender sizes the loan, checks the borrower, orders a valuation and opens title, in roughly that order. Sizing uses the contract price, the scope total and the value support: up to 90% of purchase price plus 100% of approved rehab, capped at 75% of supported ARV. Borrower review covers credit, liquidity and track record. Title confirms the seller can deliver and nothing recorded blocks the lien.
A complete package lets those steps run side by side. If you need a letter to back an offer before the file is built, see how a proof of funds letter works.
What should you send today?
Fill in the deal summary block and send it with the contract and photos, even if the scope is not finished. Then work down the list from section 2. Every other worksheet in the complete download set feeds a section of this one.
Questions: Deal submission checklist
Can I submit a Chicago flip deal before I have a signed contract?
Yes, for pricing. A lender can quote terms from the deal summary block alone: address, price, rehab budget, your comps and your experience. Without a fully signed contract it cannot order title, schedule a valuation or issue closing documents. If you are still negotiating, send the summary and the scope now, then add the contract and attorney-review letters the day they are signed, so attorney review and underwriting overlap.
Do I need an LLC before I apply for a flip loan?
The loan is made to a business entity, with its owners signing personally, so the entity has to exist before closing, not before the first conversation. If you are forming a new Illinois LLC, start the filing when your offer is accepted: the lender needs file-stamped articles, a signed operating agreement, the IRS EIN letter and a Certificate of Good Standing. Give the title company and your attorney the entity name early so the contract can be amended to match.
What bank statements does a flip lender want to see?
Expect to send the two most recent monthly statements, all pages, for every account that holds your down payment, closing costs and reserves. The lender is checking that the cash exists, that it belongs to the borrowing entity or a guarantor, and that it is yours. A large recent deposit needs a paper trail. Partner or borrowed money has to be disclosed up front, because gap or second-lien funding needs separate approval and first-lender consent.
How detailed does the experience section need to be?
List each completed project with the address, purchase date and price, rehab cost, and the sale or refinance date and price, then attach the settlement statements. Three documented flips carry more weight than ten described from memory. If this is your first project, say so plainly. First-time flippers are reviewed; maximum leverage is not assured, and the file leans harder on your contractor, your reserves and how realistic the scope looks.
Who orders the Chicago water and zoning certificates, and do they belong in my package?
They are closing items, not underwriting items, and the seller side normally orders both. Write who is handling them in the contacts block so nobody assumes someone else did. The City requires a Full Payment Certificate in transfers of real property and a Certificate of Zoning Compliance when residential property with five or fewer dwelling units is sold. Either one arriving late can move your closing date and your contractor start.
Sources
- General Contractor License, City of Chicago Department of Buildings, 2026.
- Certificate of Zoning Compliance, City of Chicago Department of Planning and Development, 2026.
- Full Payment Certificates, City of Chicago Department of Finance, 2026.
- Condominium Property Act, Section 22.1 (765 ILCS 605/22.1), Illinois General Assembly, P.A. 102-976, eff. 2023-01-01; P.A. 104-734, eff. 2027-01-01.
- Permits, City of Chicago Department of Buildings, 2026.
