A flip produces paperwork at every stage, and most of it gets rebuilt from scratch on every deal. These eight documents are the ones a Chicago deal file needs, written so they can be handed to a lender, a contractor or an attorney without explanation. Each is free, needs no email address, and is printed in full on its own page so you can read it before you download it. Four come as an Excel workbook with working formulas as well as a PDF.
They are published by a lender, Jaken Finance Group, and reflect what a lender looks for in a file. None of them contains cost estimates, rates or fees: the numbers are yours to enter.
Which document do you need at each stage of a deal?
Use them in the order the deal happens.
Before you offer. Start with the Chicago due diligence checklist. It names each city and county office that holds a record you need, from the Department of Buildings to the Cook County Clerk, and what a bad answer does to your budget. Build the comp packet at the same time, because the resale value sets the most you can pay.
Once the offer is accepted. During attorney review, write the rehab on the scope of work and budget template and send it to three contractors. Level what comes back on the contractor bid comparison sheet, which also records license and insurance checks. Then run the cash-to-close worksheet so you know the wire amount and the reserves you need behind it.
When you apply for the loan. The deal submission checklist pulls everything above into one package in the order an underwriter reads it: entity, contract, scope, value support, exit, experience, insurance and title contacts.
From closing to payoff. Enter your dates in the project timeline template on the day you close, and start the draw request log with the rehab holdback from your settlement statement. Update both weekly. Together they tell you whether the job will finish inside the loan and whether the money left in the holdback will finish the job.
How do the documents connect to each other?
The scope of work is the spine. Its line items become the rows of the bid comparison, its total feeds the cash-to-close worksheet and the loan request, and its draw phases become the rows of the draw log and the construction rows of the timeline. Change the scope and the other four change with it, so keep one current version and date it.
The comp packet stands apart on purpose. It supplies facts to a lender or appraiser and never states a value, so it should not be merged with a budget or a profit projection.
What do the spreadsheets calculate?
The Excel versions do the arithmetic that gets skipped on paper: line totals and each line's share of the budget, the low bid and the spread on every scope line, days from draw request to funding, holdback remaining, and the cost of each day a phase runs late. Shaded cells are formulas. Everything else is an input, and every input starts blank.
For the reasoning behind the numbers you enter, the numbers section covers cost stacks and carry, the process section covers draws and closings, and the flip calculators run the same math interactively.
All downloads
- ARV comp packet templateA data-only packet for a lender or appraiser: the subject before and after the work, a comparable sales grid, adjustment notes, photos and a map, with no value stated.
- Cash-to-close worksheetA fill-in worksheet that walks from purchase price and loan funded at closing to the wire amount, then adds the post-closing reserves a flip needs to finish.
- Chicago due diligence checklistEvery pre-offer and pre-closing lookup for a Chicago flip, with the exact city or county office that holds each record and what the answer does to your budget.
- Contractor bid comparison sheetA bid leveling spreadsheet that lines up three contractor bids against one scope, flags the low bidder and spread per line, and adds a license and insurance vetting sheet.
- Deal submission checklistA nine-part checklist and fill-in deal summary covering the entity, contract, scope, value support, exit, experience, insurance and title contacts a flip lender asks for.
- Draw request logA draw-by-draw log with formulas for days to fund, cumulative funded and holdback remaining, plus a lien waiver tracker and a per-draw paperwork list.
- Project timeline templateAn eighteen-phase schedule from accepted offer to payoff that compares planned and actual dates and prices each day of slip using your own daily carry cost.
- Scope of work and budget templateA trade-by-trade scope and budget sheet for Chicago rehabs, with formulas for line totals, share of budget, contractor markup, contingency and the gap you fund yourself.