The full balance comes due at maturity, so a flip that is not sold or refinanced by then needs a written extension or a new loan. Extension terms are underwritten file by file, ask your loan officer. Decide 90 days out, in this order: finish and sell, cut the price, extend, refinance, bring in a partner.
- Payment type
- interest-only, balance due at maturity
- Extension terms
- underwritten file by file, ask your loan officer
- Standard Plan Review, median days to issue
- 94 (24 months to October 2026)
- Self-Certification, median days to issue
- 27
- Slowest month for renovation permits
- December, 6.6% of a year's issuance
- Long-term exit
- DSCR loan at 5.75%-10.5%, 30-year, up to 75% LTV cash-out in Chicago
Program terms as of November 26, 2026. Rates as of November 25, 2026.
On this page
- What is actually due on the maturity date?
- Which early signs say a Chicago flip will run long?
- How often is the permit the reason?
- Does the month you finish in change the risk?
- In what order should you weigh the options?
- What does each extra month cost against a price cut?
- What should you send the lender, and when?
- What do extension and default terms look like at JFG?
- Can another lender take the loan out?
- What should you do at 90 days out?
Most flips that run long were late by the second month and nobody said so. A permit sat in review, a draw was requested after the work instead of with it, the listing went up in November. The loan's maturity date did not move while any of that happened.
This lender-published page covers the months before that date. Where JFG has not published a term, it says so.
What is actually due on the maturity date?
The entire unpaid principal is due on the maturity date, along with accrued interest. A flip loan is interest-only, so no monthly payment has reduced the balance. The ways to meet that date are a sale closing, a refinance closing, cash, or a signed extension. Passing the date without one of them is a default under an ordinary note, even if every interest payment was on time.
JFG's term length and extension terms are both underwritten file by file, ask your loan officer. Your note states yours. Read its maturity, default and extension sections the week you close.
Which early signs say a Chicago flip will run long?
A flip is running long when the schedule slips at a gate you do not control. Watch four:
- The permit is still in review at day 45 and demolition has not started.
- Less than half the rehab holdback is drawn at the midpoint of the term. Draw pace is the lender's view of your progress; see what a draw inspector checks.
- Rough inspections are not booked. The Department of Buildings sets the lead time for a request: At least 4 business days.
- Completion is now forecast for November through February.
Put those gates on a calendar with the maturity date using the maturity-date timeline template.
How often is the permit the reason?
More often than any other single cause, because plan review is the longest wait a rehab has and the one investors budget least time for. The City's own permit records for the 24 months ending October 2026 show how wide the range is.
| Review path | Permits issued | Median days to issue | Slowest quarter took longer than |
|---|---|---|---|
| Standard Plan Review | 5,535 | 94 | 161 days |
| Self-Certification | 4,995 | 27 | 54 days |
Source: City of Chicago, Department of Buildings, Building Permits (dataset ydr8-5enu), 2024-11-01 to 2026-10-31; retrieved 2026-11-26.
Those figures come from the City's building permit dataset. The Standard Plan Review median has also lengthened: 68 days for permits issued in 2024, 87 in 2025 and 105 in the first ten months of 2026. One permit in four on that path took more than five months. The City says self-certified applications typically issue within 10 business days after zoning approval, which is why the path you choose matters more than the contractor's speed. The choice is laid out under how each permit route runs.
Does the month you finish in change the risk?
Yes, because Chicago construction and permitting both slow in winter. Over the five full years from 2021 through 2025, December accounted for 6.6% of the year's renovation permits and February 7.2%, against 9.2% in May and 9.3% in August. A project that reaches masonry, concrete or roofing in January also meets the limits described under winter limits on exterior work. If your maturity date falls between December and March, treat it as arriving a month early.
In what order should you weigh the options?
Weigh them from cheapest to most expensive in total dollars, which is rarely the order that feels easiest.
| Option | Use it when | What it costs | First move |
|---|---|---|---|
| Finish and sell | Work is within weeks of done | Nothing extra | Lock a completion date; add crew |
| Cut the price | Listed and not selling | The cut, less commission and transfer tax on it | Reprice against the three newest comps |
| Extend | A contract or a firm completion date exists | Extension terms: underwritten file by file, ask your loan officer | Written request 60 to 90 days out |
| Refinance | The building rents, or another lender will take it | New loan costs and a new rate | Start the application 90 days out |
| Partner capital | Cash, not time, is what is missing | A share of profit | Agree terms in writing first |
Partner structures are compared under flip loan or money partner. Keeping the building as a rental is a different decision with its own mechanics, covered in sale or refinance at exit.
What does each extra month cost against a price cut?
Each extra month costs interest on the full balance plus taxes, insurance and utilities, and that total is the yardstick for any price cut.
A $470,000 two-flat that is finished but unsold: wait, or cut $12,000?
Inputs are illustrative, not an offer. No extension fee is included because extension terms are unpublished.
30 more days
| Line | Amount | How it is figured |
|---|---|---|
| Interest | $3,033 | $323,500 at 11.25%, $101.09 a day |
| Taxes, insurance, utilities | $1,825 | $1,850 a month, $60.82 a day |
| Cost of 30 days | $4,857 |
Line items sum to the stated result. Checked in code at build.
60 more days
| Line | Amount | How it is figured |
|---|---|---|
| Interest | $6,065 | |
| Taxes, insurance, utilities | $3,649 | |
| Cost of 60 days | $9,715 |
Line items sum to the stated result. Checked in code at build.
90 more days
| Line | Amount | How it is figured |
|---|---|---|
| Interest | $9,098 | |
| Taxes, insurance, utilities | $5,474 | |
| Cost of 90 days | $14,572 |
Line items sum to the stated result. Checked in code at build.
A $12,000 price cut that sells now
| Line | Amount | How it is figured |
|---|---|---|
| Lower sale price | $12,000 | |
| Commission not paid on the cut | -$600 | 5% of $12,000 |
| Seller transfer taxes not paid | -$54 | City, county and state seller portions |
| Net cost of the cut | $11,346 |
Line items sum to the stated result. Checked in code at build.
The cut costs $11,346, about 70 days of holding. If the price is the reason the house has not sold, cutting beats waiting any longer than that.
Assumptions
- Rate of 11.25% is an input inside the published range of 8.99%-13.5%, not a quote. Interest is figured on the full $323,500 commitment.
- Any extension fee or default interest would add to every delay figure.
Run your own balance and carry through the calculator for days past plan before the next conversation with your agent.
What should you send the lender, and when?
Send a complete written request 60 to 90 days before maturity, while the loan is current. A request that arrives after the date is a workout, and you negotiate from a weaker position.
- A one-paragraph status: percent complete, what remains, the new completion date.
- Budget against actual, with draws received and the balance of the holdback.
- Permit and inspection status, with the permit number.
- The exit evidence: listing, showing activity, a signed contract, or a refinance application.
- Current comparable sales supporting the price.
- The date you are asking for, and proof that interest, taxes and insurance are paid.
What do extension and default terms look like at JFG?
JFG has not published them, so this page will not state a fee, a default rate or a maximum extension length. Each is underwritten file by file, ask your loan officer. What is published: interest at 8.99%-13.5%, 1-3 points at origination, and staged against a rehab holdback, with inspections.
The statutory backdrop is public. If an Illinois lender does foreclose, a borrower may reinstate within 90 days from service under section 15-1602. A vacant investment property held in an LLC generally falls outside the statutory definition of residential real estate, which turns on owner occupancy, so the shorter redemption period in section 15-1603 applies. A personal guarantee keeps you liable for a shortfall. This is general education; have counsel read your documents.
Can another lender take the loan out?
Yes, if the collateral supports it, and it is worth asking before maturity. JFG runs a second-look review for borrowers whose current lender will not extend or whose file was declined elsewhere. Two published products fit a flip that needs time: bridge loans in Chicago for a building that will still be sold, and DSCR loans in Chicago for one that will be rented, with the exit described as a DSCR loan at 5.75%-10.5%, 30-year, up to 75% LTV cash-out in Chicago. How those products differ is covered in flip, bridge or hard money. A refinance never comes free of cash: new points, title and closing costs are due again.
When more time will not fix it
An extension will not work when the house is unfinished and the money to finish it is gone. More months add interest to a project with no path to completion, and a lender can see that in the draw history.
The better route is to stop and reprice the whole deal: get a fixed bid for the remaining scope, bring in a partner or sell the building as-is to another investor, and pay the loan off while there is still equity to do it.
What should you do at 90 days out?
Mark the date 90 days before maturity today, whatever month the project is in. On that day, compare the forecast completion date and a realistic sale closing with the maturity date. If they do not fit with 30 days to spare, send the six-item package that week. The rest of the sequence is in the timeline from offer to payoff, and the other process guides cover the steps on either side.
Questions: When a flip runs long
Does paying the monthly interest keep the loan in good standing after maturity?
Not by itself. On an interest-only note the whole principal is due on the maturity date, so a loan can be current on interest and still be in default the day after. Whether the lender accepts payments past that date, and at what rate, is set by your note and any written extension. Read the default and maturity sections of the note now, and get any extension in writing before the date passes.
Is an investor's flip treated as residential real estate if an Illinois lender forecloses?
Usually not. The Illinois Mortgage Foreclosure Law defines residential real estate by occupancy: the borrower, or for a corporation its majority owners, must live in a unit as a principal residence. A vacant flip held in an LLC does not meet that test, so the shorter non-residential redemption period applies: Later of 6 months after service or 3 months after judgment. Confirm how the definition applies to your entity with an Illinois attorney.
Should I list the house before the rehab is finished?
List when the remaining work is cosmetic and will be done before a buyer's inspection, not before. A listing that sits unfinished collects days on market, and that history weakens the price argument later. If maturity is close, spend that week getting a firm completion date, final permit inspections scheduled and photographs booked.
Can partner or gap money buy more time?
It can fund the finish, which is often what an extension request lacks. A partner's cash can complete the scope, cover interest, or pay the loan down. Subordinate debt is different: gap or second-lien funding needs separate approval and first-lender consent, so never record a second lien or sign a partner agreement that grants a lien without asking the first lender. Compare the cost of gap funding with a price cut first.
Does the City charge more as a project drags on?
Some costs recur. Chicago's vacant building registration lasts 6 months and must be renewed, at $30 per renewal. Cook County charges 0.75% per month (9% per year) on late property taxes, so an installment skipped to save cash grows. From September 15 to June 1 a building with tenants must also be heated under the Heat Ordinance.
Local rates and rules cited on this page
| Item | Figure | Primary source | Effective |
|---|---|---|---|
| Permit inspection request lead time | At least 4 business days | Permit Inspections (City of Chicago Department of Buildings) | 2026 |
| Self-Certification typical issuance time | 10 business days after zoning approval | Self-Certified Permit Application Program (City of Chicago Department of Buildings) | 2026 |
| Reinstatement period | 90 days from service | 735 ILCS 5/15-1602 - Reinstatement (Illinois General Assembly (ilga.gov)) | 2026 |
| Non-residential foreclosure redemption period | Later of 6 months after service or 3 months after judgment | 735 ILCS 5/15-1603(b)(2) - Redemption (Illinois General Assembly (ilga.gov)) | 2025-08-15 |
| Vacant building registration term | 6 months | Requirements for Vacant Building Owners (Revised 1/2026) (City of Chicago Department of Buildings) | 2026-01 |
| Vacant building renewal fee | $30 per renewal | Requirements for Vacant Building Owners (Revised 1/2026) (City of Chicago Department of Buildings) | 2026-01 |
| Interest on late Cook County property taxes | 0.75% per month (9% per year) | Free Payment Plan Calculator now live online (press release) (Cook County Treasurer's Office) | 2026-09-30 |
| Chicago transfer tax, City portion (buyer) | $3.75 per $500 of price | Real Property Transfer Tax (7551) (City of Chicago Department of Finance) | 2008-04-01 |
| Chicago transfer tax, CTA portion (seller) | $1.50 per $500 of price | Real Property Transfer Tax (7551) (City of Chicago Department of Finance) | 2008-04-01 |
| Cook County real estate transfer tax | $0.25 per $500 of value | Transfer Fees (Cook County Clerk) | 1968-01-01 |
| Illinois state real estate transfer tax | $0.50 per $500 of value | 35 ILCS 200/31-10, Imposition of tax (Illinois General Assembly) | 2005-06-01 |
Rates as of November 25, 2026. Confirm with the agency before relying on any figure.
Sources
- Building Permits dataset, City of Chicago Department of Buildings, data through 2026-10-31.
- Self-Certification Permit Program, City of Chicago Department of Buildings, 2026.
- 735 ILCS 5/15-1219, Residential Real Estate, Illinois General Assembly, P.A. 97-1164, eff. 2013-06-01.
- 735 ILCS 5/15-1603, Redemption, Illinois General Assembly, 2025-08-15.
- 735 ILCS 5/15-1602, Reinstatement, Illinois General Assembly, 2026.
- Vacant building owner requirements, City of Chicago Department of Buildings, 2026-01.
- Interest on late property taxes, Cook County Treasurer, 2026-09-30.